Step 3 • Delivery & Move‑In

Delivery Day Checklist

Everything you need to be ready: owner tasks, on‑site timeline, orientation, and follow‑ups. Print and check items off as you go.

Delivery at a glance

Four simple phases—clear roles and no surprises.

One week before






Day before





Morning of




Who does what?

Owner / Contractor

Pad/foundation & driveway work

Utility trenching & stubs to set point

Permits/HOA approvals & inspections

Wolf Valley

Build, transport coordination, set & anchoring

Leveling & quality checks; cleanup of work area

Orientation; warranty; 30/90‑day follow‑ups

If special equipment (e.g., crane) is required, we’ll quote it in advance—no surprises.

Need help today?

If you have last‑minute questions about access, utilities, or weather, reach out and we’ll adjust the plan.

On‑site timeline (typical day)

Timing can vary by site and weather; your Guide will confirm specifics.

1

Arrival & safety brief
Final route review; site walk; staging plan; roles & radios.

2

Position & set
Place the home, level precisely, and anchor per code.

3

Utility tie‑ins
Connect to owner‑prepared stubs (by your contractor) and test basics.

4

Quality check & clean‑up
Doors/windows; level; fasteners; jobsite tidy and safe.

5

Orientation & sign‑off
Walkthrough of systems, maintenance, and warranty.

Orientation checklist (with your Guide)










Open punch‑list (if needed)

Email photos and a short description. Your Guide will confirm and schedule any fixes.

30‑day check‑in

We make sure everything feels right. Keep notes and questions handy.

90‑day follow‑up

A final touchpoint to close the loop and celebrate your new home.

We’re here for delivery day and beyond.

Questions now or later—reach out and we’ll guide you.