Step 1: Land & Site Readiness

Is your land ready?

Before you buy, let’s confirm access, utilities, setbacks, and site prep. A quick check now prevents costly surprises later.

✓ Access & Turnaround

Driveway width/grade; no low branches/power lines; room to turn/set.

✓ Pad/Foundation

Level, compacted pad or chosen foundation; clear of stumps/rocks.

✓ Setbacks & Orientation

Meets local rules; ideal placement for sun, breeze, and views.

✓ Utilities Plan

Power, water, sewer/septic distances and trenching path mapped.

✓ Permits/HOA

Any known HOA/city/county requirements or special conditions.

✓ Site Photos

Road approach → driveway → pad area. We’ll verify from photos

What we verify (free)

Send us your address/pin and 3 photos—we’ll assess access, setbacks, pad needs, and utility routes.

  • Truck access & turning radius; low obstacles (branches/lines/gates)
  • Setbacks/easements & obvious permit blockers
  • Pad/foundation suitability and anchoring needs
  • Utility tie‑in feasibility (distance, trenching path)
  • Best orientation for porch, sun, views, and wind

Feasibility outcomes

Green

Good to go. Clear path to proposal & scheduling.

Amber

Minor issues with clear fixes (trim trees, widen gate, etc.).

Red

Major blocker identified; we’ll outline options or alternatives.

Either way, you’ll know where you stand before spending money.

Who does what?

We’re clear up front so there are no surprises later.

Owner / Your Contractor

  • Pad/foundation & driveway improvements
  • Utility stubs to the set location (power/water/sewer or septic)
  • Permits/HOA approvals as required locally

Wolf Valley

  • Feasibility guidance & site prep checklist
  • Build, delivery, set, and anchoring of the home
  • Owner orientation, warranty, and 30/90‑day check‑ins

Timeline & next steps

  • Feasibility: 3–5 business days after photos/address
  • Proposal: 48–72 hours after feasibility green/amber
  • Delivery window: set after contract & site‑ready gate

Frequently Asked Questions

Do you help with permits and HOA approvals?

We’ll clarify what’s typically required and help you prepare information for your local authority/HOA. You or your contractor submit the applications since each jurisdiction has its own process.

We can review candidate parcels before you make an offer. Send a link, address, or a GPS pin and we’ll flag access, setbacks, utilities, and likely pad needs.

We’ll specify the tie‑in locations and distances. Trenching is typically handled by your local contractor; we’ll coordinate to make sure everything connects smoothly.

A firm, level, well‑compacted pad is essential. We’ll tell you the dimensions and tolerances for your chosen model so your contractor can prepare it right the first time.

Our crew arrives within your scheduled window, sets and anchors the home, and walks you through orientation. If any punch‑list items arise, we close them quickly.

Make sure your land is ready—then move forward with confidence.

We’ll verify the essentials and outline any fixes—fast and friendly.