Everything you need to be ready: owner tasks, on‑site timeline, orientation, and follow‑ups. Print and check items off as you go.
Four simple phases—clear roles and no surprises.
Owner / Contractor
Pad/foundation & driveway work
Utility trenching & stubs to set point
Permits/HOA approvals & inspections
Wolf Valley
Build, transport coordination, set & anchoring
Leveling & quality checks; cleanup of work area
Orientation; warranty; 30/90‑day follow‑ups
If special equipment (e.g., crane) is required, we’ll quote it in advance—no surprises.
If you have last‑minute questions about access, utilities, or weather, reach out and we’ll adjust the plan.
Timing can vary by site and weather; your Guide will confirm specifics.
Arrival & safety brief
Final route review; site walk; staging plan; roles & radios.
Position & set
Place the home, level precisely, and anchor per code.
Utility tie‑ins
Connect to owner‑prepared stubs (by your contractor) and test basics.
Quality check & clean‑up
Doors/windows; level; fasteners; jobsite tidy and safe.
Orientation & sign‑off
Walkthrough of systems, maintenance, and warranty.
Email photos and a short description. Your Guide will confirm and schedule any fixes.
We make sure everything feels right. Keep notes and questions handy.
A final touchpoint to close the loop and celebrate your new home.
Questions now or later—reach out and we’ll guide you.